2008
1
-
Renewal of an automated cell D530
2
-
extension capacity heat-treatment "factory water"
       
 2007
1
-
Renewal of 2 sprayer WOLLING
2
-
Replacement by a dosing furnace KROWN
3
-
Replacement by CNC miling center TOYODA
       
 2006
1
-
CNC milling center
2
-
"spinner-hanger" shot-blasting machine
3
-
3D Mesuring Machine
4
-
Handling robots
5
-
Filting out utilities and officies
     
 2005
1
-
Water cooling optimisation
2
-
Broching
3
-
ISO 14001 certificat
     
 2004
1
-
Die casting machine 420T BUHLER
2
-
Storage area reset
3
-
Automatisation of die casting machine
     
 2003
1
-
Certification ISO/TS 16949: 2002
2
-
Plans extension 2700 m²
3
-
Melting over : two oven of 1.5 tons electric powered (induction) to melt aluminium alloys with more security, higher quality of aluminium liquid with control of parameters and better flexibility for different type of alloys
4
-
Water treatment of vibrators
5
-
Wasted water treatment
     
 2002
1
-
Certification ISO 9001: 2000 and ISO/TS 16949: 1999
2
-
Replacement diecasting machine
3
-
Pursuing automatisation of machining
4
-
Studies for fusion extension
 
 2001
1
-
Persuing improvements in work shop lay-out
2
-
New diecasting machine 630 SC
3
-
Renewal diecasting machine 220 T
4
-
Shop fume aspiration
 
 2000
1
-
Introduction of computer aided Maintenance
2
-
Persuing improvements in work shop layout
3
-
IIntroduction of a CNC and lathe
4
-
Certification QS 9000
5
-
Converting accounts to Euro
 
 1999
1
-
Subsidary of Groupe S3I
2
-
New logistic - planning CIM CAPAMIX
3
-
Real time supervision machines
4
-
Finalising QS 9000 quality system
5
-
Improving inside and outside outlet
6
-
Euro and year 2000 upgrades
 
 1998
1
-
Aluminium melting capacity extended
2
-
Two new die casting machines 560 and 840 Buhler SC EDI connection
3
-
EDI connection
 